- 我要卖房 -- 免费展示房源
- 注册或登录
-
简体中文- zh
-
CNY - ¥
Golden Pool Villas (Phase 1) 为 苏梅岛 波普托 房屋和独栋别墅 项目 共有5 单元 由Nala Sawasdee Pool 开发,也即 Golden Pool Villas (Phase 2)
The building (the bricks and mortar) can be owned by a non-Thai national outright in their name in what is called the house registry, which secures ownership indefinitely of the structure.
In Thailand, non-Thai nationals cannot own land outright in their name. Land can be controlled through either a Thai Company or a long-term registered lease. The longest registered lease term by Thai law is 30 years, and most developers will offer 3 terms for a total of 90 years.
A 30-year lease period is legally protected under Thai law and ownership cannot be disrupted. It is common for developers to offer an additional two terms of 30 contractually obligating a total of 90 years.
Prior to purchasing a leasehold property, it is important to secure a copy of the lease agreement or get further clarity on these three points:
After you have found the right property at Golden Pool Villas (Phase 1) you have to follow these steps:
Golden Pool Villas (Phase 1) 分期付款 里程碑 付款 第1期 Signing of the contract for the construction work. 30% 第2期 When the list below completed. 2.1 Footing & stud column structure completed 2.2 Lower floor structure completed 2.3 2nd. floor structure completed 2.4 Roof Steel structure completed 19% 第3期 When the list below completed. 3.1 Roof finishes completed 3.2 Walls masonry completed 3.3 Walls cement render completed 3.4 Wall Finishes completed 3.5 Ceiling Finishes completed 20% 第4期 When the list below completed. 4.1 Floor Finishes completed 4.2 Doors & windows completed 4.3 Sanitary ware completed 4.4 Painting completed 18% 第5期 When the list below completed. 5.1 Last inspection of the house 5.2 Handover 10% Golden Pool Villas (Phase 1) 分期付款 里程碑 付款 第1期 Signing of the contract for the construction work. 30% 第2期 When the list below completed. 2.1 Footing & stud column structure completed 2.2 Lower floor structure completed 2.3 2nd. floor structure completed 2.4 Roof Steel structure completed 20% 第3期 When the list below completed. 3.1 Roof finishes completed 3.2 Walls masonry completed 3.3 Walls cement render completed 3.4 Wall Finishes completed 3.5 Ceiling Finishes completed 19% 第4期 When the list below completed. 4.1 Floor Finishes completed 4.2 Doors & windows completed 4.3 Sanitary ware completed 4.4 Painting completed 20% 第5期 When the list below completed. 5.1 Last inspection of the house 5.2 Handover 10% Golden Pool Villas (Phase 1) 分期付款 里程碑 付款 第1期 Signing of the contract for the construction work. 30% 第2期 When the list below completed. 2.1 Footing & stud column structure completed 2.2 Lower floor structure completed 2.3 2nd. floor structure completed 2.4 Roof Steel structure completed 20% 第3期 When the list below completed. 3.1 Roof finishes completed 3.2 Walls masonry completed 3.3 Walls cement render completed 3.4 Wall Finishes completed 3.5 Ceiling Finishes completed 20% 第4期 When the list below completed. 4.1 Floor Finishes completed 4.2 Doors & windows completed 4.3 Sanitary ware completed 4.4 Painting completed 20% 第5期 When the list below completed. 5.1 Last inspection of the house 5.2 Handover 10%
Golden Pool Villas (Phase 1)
位置便利,距离 7-11仅有 270米,可以在4 分钟分钟内步行到达。
Golden Pool Villas (Phase 1)的周围有许多商店,最靠近的三个是:
- 潘公工程
距离190米(可以在 3 分钟分钟内步行到达)
- 迷你大C
距离270米(可以在 4 分钟分钟内步行到达)
- Vanich Ler 的店铺 距离400米(可以在 6 分钟分钟内步行到达)
Golden Pool Villas (Phase 1)所在的周边地区提供各种各样的餐厅。请在以下查看当中最接近的:
- Charlie's - Plai Laem(苏梅岛)
距离190米(可以在 3 分钟分钟内步行到达)
- WokStar Express - Plai Laem(苏梅岛)
距离200米(可以在 3 分钟分钟内步行到达)
- 茶店 Decha Roti Chachak 分店 6 Plai Laem-Bang Rak RotiDecha ( Pancake Near me )
距离240米(可以在 4 分钟分钟内步行到达)
最近的医疗机构是纪念公共卫生服务中心成立84周年(班克拉),距离 4.4 公里米(只需10 分钟的车程) 离最近的学校是:
- Masjid Nurul hidayah苏梅岛(Tansri Dr.Nik Hussian bin Abdul rahman马来西亚) 距离 2.1 公里米(只需4 分钟分钟的车程)
- Thanyawarat Lertwit学校 距离 1.9 公里米(只需4 分钟分钟的车程)
- 苏梅岛特殊儿童基金会 距离 3.3 公里米(只需7 分钟分钟的车程)
苏梅岛机场距离Golden Pool Villas (Phase 1) 5.2 公里,需要大约 11 分钟的车程(取决于交通状况)。