- 我要卖房 -- 免费展示房源
- 注册或登录
-
简体中文- zh
-
CNY - ¥
该房源是面积154.60 平米的别墅 ,拥有3 卧室 和3 卫生间 ,目前售 中 。您可以基础价 ¥1,440,000 (¥9,290/SqM) 购买该别墅 。
外国人能以自己的名义持有 (别墅)的房产但不持有土地所有权。
外国人不能拥有泰国土地。唯一操作方式是通过泰国公司持有或通过为期30年的租赁产权持有。
The building (the bricks and mortar) can be owned by a non-Thai national outright in their name in what is called the house registry, which secures ownership indefinitely of the structure.
In Thailand, non-Thai nationals cannot own land outright in their name. Land can be controlled through either a Thai Company or a long-term registered lease. The longest registered lease term by Thai law is 30 years, and most developers will offer 3 terms for a total of 90 years.
A 30-year lease period is legally protected under Thai law and ownership cannot be disrupted. It is common for developers to offer an additional two terms of 30 contractually obligating a total of 90 years.
Prior to purchasing a leasehold property, it is important to secure a copy of the lease agreement or get further clarity on these three points:
After you have found the right property at Golden Pool Villas (Phase 1) you have to follow these steps:
Golden Pool Villas (Phase 1) 分期付款 里程碑 付款 第1期 Signing of the contract for the construction work. 30% 第2期 When the list below completed. 2.1 Footing & stud column structure completed 2.2 Lower floor structure completed 2.3 2nd. floor structure completed 2.4 Roof Steel structure completed 19% 第3期 When the list below completed. 3.1 Roof finishes completed 3.2 Walls masonry completed 3.3 Walls cement render completed 3.4 Wall Finishes completed 3.5 Ceiling Finishes completed 20% 第4期 When the list below completed. 4.1 Floor Finishes completed 4.2 Doors & windows completed 4.3 Sanitary ware completed 4.4 Painting completed 18% 第5期 When the list below completed. 5.1 Last inspection of the house 5.2 Handover 10% Golden Pool Villas (Phase 1) 分期付款 里程碑 付款 第1期 Signing of the contract for the construction work. 30% 第2期 When the list below completed. 2.1 Footing & stud column structure completed 2.2 Lower floor structure completed 2.3 2nd. floor structure completed 2.4 Roof Steel structure completed 20% 第3期 When the list below completed. 3.1 Roof finishes completed 3.2 Walls masonry completed 3.3 Walls cement render completed 3.4 Wall Finishes completed 3.5 Ceiling Finishes completed 19% 第4期 When the list below completed. 4.1 Floor Finishes completed 4.2 Doors & windows completed 4.3 Sanitary ware completed 4.4 Painting completed 20% 第5期 When the list below completed. 5.1 Last inspection of the house 5.2 Handover 10% Golden Pool Villas (Phase 1) 分期付款 里程碑 付款 第1期 Signing of the contract for the construction work. 30% 第2期 When the list below completed. 2.1 Footing & stud column structure completed 2.2 Lower floor structure completed 2.3 2nd. floor structure completed 2.4 Roof Steel structure completed 20% 第3期 When the list below completed. 3.1 Roof finishes completed 3.2 Walls masonry completed 3.3 Walls cement render completed 3.4 Wall Finishes completed 3.5 Ceiling Finishes completed 20% 第4期 When the list below completed. 4.1 Floor Finishes completed 4.2 Doors & windows completed 4.3 Sanitary ware completed 4.4 Painting completed 20% 第5期 When the list below completed. 5.1 Last inspection of the house 5.2 Handover 10%